LEYTE CEBU GEOTHERMAL
Sector: Power Generation (CCGT) • Location: Philippines
Source: World Bank Group
The objectives of the project are to: (a) meet the rapidly increasing demand for power in Cebu and the Visayas region using indigenous and environmentally superior geothermal energy; (b) strengthen the institutional, planning and financial systems of the National Power Corporation (NPC) and the Philippine National Oil Company (PNOC); (c) promote private sector participation in power generation; (d
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Geothermal, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LEYTE CEBU GEOTHERMAL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the project are to: (a) meet the rapidly increasing demand for power in Cebu and the Visayas region using indigenous and environmentally superior geothermal energy; (b) strengthen the institutional, planning and financial systems of the National Power Corporation (NPC) and the Philippine National Oil Company (PNOC); (c) promote private sector participation in power generation; (d) improve the performance of the energy sector through better policies and implementing mechanisms; and (e) ensure the financial viability of NPC and PNOC to undertake a long-overdue investment program. The project includes the following components: PNOC will: (a) develop a 185 MW geothermal energy field which will also include steam collection and power subtransmission systems; (b) enter into a build-operate-transfer contract with private sector companies to construct and operate a 185 MW geothermal power plant; and (c) carry out technical assistance for project implementation. For its part, NPC will: (a) construct an overhead transmission line in Leyte and another in Cebu; (b) install a submarine cable linking the Leyte-Cebu lines; (c) upgrade its existing 138 kV and 69 kV power transmission facilities in Cebu; (d) carry out technical assistance consultancies for the design and preparation of tender documents for two hydroelectric projects; and (e) carry out institutional support consultancies to implement the project, its power development program and the recommendations of the efficiency and operational improvement study. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
