LEYTE LUZON GEOTHERMAL
Sector: Power Transmission • Location: Philippines
Source: World Bank Group
The objectives of the Leyte-Luzon Geothermal project are to: 1) meet the rapidly increasing demand for power in Luzon; 2) strengthen the energy sector; 3) support the large ongoing private sector participation in power generation; 4) strengthen the National Power Corporation's (NPC) capabilities in environmental and social impact analyses; 5) introduce Expanded Cofinancing Operation in the Philipp
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objectives of the Leyte-Luzon Geothermal project are to: 1) meet the rapidly increasing demand for power in Luzon; 2) strengthen the energy sector; 3) support the large ongoing private sector participation in power generation; 4) strengthen the National Power Corporation's (NPC) capabilities in environmental and social impact analyses; 5) introduce Expanded Cofinancing Operation in the Philippines; and 6) ensure the financial viability of NPC and Philippine National Oil Company (PNOC) for undertaking a long-overdue investment program. The project includes the following components: a) PNOC and Energy Development Corporation Subsidiary of PNOC will develop a 440 Megawatt (MW) geothermal energy field to expand Leyte geothermal capacity from 200 MW to 640 MW; b) PNOC-EDC will also enter into Build-Operate-Transfer contracts with private sector companies to construct and operate 440 MW geothermal power plants; and c) NPC will: i) contract two high voltage monopole converter stations; ii) construct overhead transmission lines in Leyte; iii) install a submarine cable; iv) construct a twin circuit overhead transmission line from Ormoc to Matnog cable terminal and from Cabacungan to Naga; v) recruit two advisers for strengthening its environmental and social engineering departments; and vi) recruit consultants to support the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
