LEYTE LUZON GEOTHERMAL
Sector: Power Transmission • Location: Philippines
Source: World Bank Group
The objectives of the Leyte-Luzon Geothermal project are to: 1) meet the rapidly increasing demand for power in Luzon; 2) strengthen the energy sector; 3) support the large ongoing private sector participation in power generation; 4) strengthen the National Power Corporation's (NPC) capabilities in environmental and social impact analyses; 5) introduce Expanded Cofinancing Operation in the Philipp
- Status
- Closed
- Sector
- Power Transmission, Oil and Gas, Geothermal, Commercial, Power Generation (CCGT), Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LEYTE LUZON GEOTHERMAL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Leyte-Luzon Geothermal project are to: 1) meet the rapidly increasing demand for power in Luzon; 2) strengthen the energy sector; 3) support the large ongoing private sector participation in power generation; 4) strengthen the National Power Corporation's (NPC) capabilities in environmental and social impact analyses; 5) introduce Expanded Cofinancing Operation in the Philippines; and 6) ensure the financial viability of NPC and Philippine National Oil Company (PNOC) for undertaking a long-overdue investment program. The project includes the following components: a) PNOC and Energy Development Corporation Subsidiary of PNOC will develop a 440 Megawatt (MW) geothermal energy field to expand Leyte geothermal capacity from 200 MW to 640 MW; b) PNOC-EDC will also enter into Build-Operate-Transfer contracts with private sector companies to construct and operate 440 MW geothermal power plants; and c) NPC will: i) contract two high voltage monopole converter stations; ii) construct overhead transmission lines in Leyte; iii) install a submarine cable; iv) construct a twin circuit overhead transmission line from Ormoc to Matnog cable terminal and from Cabacungan to Naga; v) recruit two advisers for strengthening its environmental and social engineering departments; and vi) recruit consultants to support the project. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Oil and Gas, Geothermal, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
