logo
ProjectClosed

LEYTE LUZON GEOTHERMAL

Sector: Power Transmission • Location: Philippines

Source: World Bank Group

The objectives of the Leyte-Luzon Geothermal project are to: 1) meet the rapidly increasing demand for power in Luzon; 2) strengthen the energy sector; 3) support the large ongoing private sector participation in power generation; 4) strengthen the National Power Corporation's (NPC) capabilities in environmental and social impact analyses; 5) introduce Expanded Cofinancing Operation in the Philipp

Status
Closed
Sector
Power Transmission, Oil and Gas, Geothermal, Commercial, Power Generation (CCGT), Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about LEYTE LUZON GEOTHERMAL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “LEYTE LUZON GEOTHERMAL” is an infrastructure initiative in the Power Transmission sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Leyte-Luzon Geothermal project are to: 1) meet the rapidly increasing demand for power in Luzon; 2) strengthen the energy sector; 3) support the large ongoing private sector participation in power generation; 4) strengthen the National Power Corporation's (NPC) capabilities in environmental and social impact analyses; 5) introduce Expanded Cofinancing Operation in the Philippines; and 6) ensure the financial viability of NPC and Philippine National Oil Company (PNOC) for undertaking a long-overdue investment program. The project includes the following components: a) PNOC and Energy Development Corporation Subsidiary of PNOC will develop a 440 Megawatt (MW) geothermal energy field to expand Leyte geothermal capacity from 200 MW to 640 MW; b) PNOC-EDC will also enter into Build-Operate-Transfer contracts with private sector companies to construct and operate 440 MW geothermal power plants; and c) NPC will: i) contract two high voltage monopole converter stations; ii) construct overhead transmission lines in Leyte; iii) install a submarine cable; iv) construct a twin circuit overhead transmission line from Ormoc to Matnog cable terminal and from Cabacungan to Naga; v) recruit two advisers for strengthening its environmental and social engineering departments; and vi) recruit consultants to support the project.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Oil and Gas, Geothermal, Commercial, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project