LG Electronics India Solar PPAs for Manufacturing Operations
Sector: Solar • Location: Greater Noida and Pune, Uttar Pradesh and Maharashtra, India
Source: pv magazine India
LG Electronics India has signed long-term solar power purchase agreements totaling 20.8 MWp with Hinduja Renewables and Sunsure Energy to supply renewable electricity to its manufacturing facilities in Greater Noida and Pune. The PPAs cover 9.8 MWp for the Pune facility and 11 MWp for the Greater Noida plant, sourcing approximately 3.21 crore units of renewable energy annually and offsetting aroun
- Status
- Prospective
- Sector
- Solar, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Greater Noida and Pune, Uttar Pradesh and Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- pv magazine India
ConstructChat
Ask ConstructChat about LG Electronics India Solar PPAs for Manufacturing Operations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | LG Electronics India has signed long-term solar power purchase agreements totaling 20.8 MWp with Hinduja Renewables and Sunsure Energy to supply renewable electricity to its manufacturing facilities in Greater Noida and Pune. The PPAs cover 9.8 MWp for the Pune facility and 11 MWp for the Greater Noida plant, sourcing approximately 3.21 crore units of renewable energy annually and offsetting around 0.61 million metric tonnes of CO2e over the project lifetime. The agreements are for 25 years and scheduled to commence in Q2 2026. |
Original sector | Energy |
Location
Country | India |
State | Uttar Pradesh and Maharashtra |
City | Greater Noida and Pune |
Source
Source | pv magazine India |
URL |
More Details
Record type | Project |
Sector | Solar, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
