logo

LG Energy Solution ESS Supply Contract with DTE Energy

Sector: Energy Storage • Location: Saline Township, Michigan, United States

Source: Chosunbiz

Project
Awarded

LG Energy Solution signed a contract to supply 6 GWh of energy storage system (ESS) batteries to DTE Energy, the largest integrated energy corporation in Michigan. The contract value is $1.6 billion, with a supply period of about two years. The ESS will support eight core grid-building projects including an AI data center for Oracle in Saline Township, Michigan, to stabilize power supply and impro

Status
Closed
Sector
Energy Storage, Power Generation (CCGT), Data Center, Commercial
Location
Saline Township, Michigan, United States of America
Updated
22 Jul 2026
Source
Chosunbiz

ConstructChat

Ask ConstructChat about LG Energy Solution ESS Supply Contract with DTE Energy

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “LG Energy Solution ESS Supply Contract with DTE Energy” is an infrastructure initiative in the Energy Storage sector, located in Saline Township, Michigan, United States. Taiyo aggregates data on it from Chosunbiz.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

LG Energy Solution signed a contract to supply 6 GWh of energy storage system (ESS) batteries to DTE Energy, the largest integrated energy corporation in Michigan. The contract value is $1.6 billion, with a supply period of about two years. The ESS will support eight core grid-building projects including an AI data center for Oracle in Saline Township, Michigan, to stabilize power supply and improve operational efficiency.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Saline Township

Source

Source

Chosunbiz

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Data Center, Commercial

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project