LGU Urban Water and Sanitation Project APL2
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project objective of the Second LGU Urban Water and Sanitation Project (APL)for the Philippines is to extend the outreach of the project to approximately 40 more LGU-managed water utilities. The project objective is one of confirming in more LGUs that the project design concept in APL1 (i.e., with appropriate technical and financial designs, pricing rules and institutional incentives, water su
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Education
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LGU Urban Water and Sanitation Project APL2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project objective of the Second LGU Urban Water and Sanitation Project (APL)for the Philippines is to extend the outreach of the project to approximately 40 more LGU-managed water utilities. The project objective is one of confirming in more LGUs that the project design concept in APL1 (i.e., with appropriate technical and financial designs, pricing rules and institutional incentives, water supply systems, irrespective of size, can be made both viable and sustainable), is robust enough to be mainstreamed into the water supply sector of the Philippines. There are four project components. The first finances civil works, equipment, and supervision for improved water supply systems in LGUs, water utilities where private operators were selected under procedures acceptable to the Bank, and regional water utilities. The second component finances physical infrastructure in household toilets, on-site sanitation facilities, including soakaway pits for septic tank effluents or the disposal of wastewater flows arising from augmented water supplies hygiene education. The third component finances investments and consultant services in micro-drainage infrastructure. Finally, the fourth component funds the hiring of a construction supervision consultant and of specialized consultants. |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Philippines |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Education |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
