LHM House / André Becker
Sector: Road
Source: ArchDaily
The project developed a new pavement, and completely remodeled existing flows and environments. We demolished part of the building to transform it into an aerial garden and SPA.The house is in front of a public square with beautifull trees. The project sought to open up more to the square, and fill the house with gardens on all floors, creating a symbiotic relationship between them.Text descriptio
- Status
- Closed
- Sector
- Road, Cement, Residential, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about LHM House / André Becker
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project developed a new pavement, and completely remodeled existing flows and environments. We demolished part of the building to transform it into an aerial garden and SPA.The house is in front of a public square with beautifull trees. The project sought to open up more to the square, and fill the house with gardens on all floors, creating a symbiotic relationship between them.Text description provided by the architects.The basis of this project was an existing two-story renovation of a residence and a shed with service areas. The renovated residence was the work of Aurélio Martinez Flores(1929-2015), a Mexican architect living in Brazil, who influenced an entire generation of architects from São Paulo.The new structure is metallic: light and quick to assemble, allowing a clear reading of every moment of the work. This new exoskeleton has two pillars on the side of the house, and other two pillar using a existing concrete slab as support, allowing for the new floor to preserve the original structure without the need for reinforcements. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects
- Auburn Avenue Historic and Cultural Information Project
- M.L. King Jr. Dr. Cycle Track
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
