logo

Liander Westpoort / De Zwarte Hond

Sector: Steel

Source: ArchDaily

Project
Closed

The office building and training facilities have an all-timber construction, designed to be flexible and create a healthy working environment. Thanks to its detachable structural set-up the parking building can grow or shrink. The facades are made of weather-resistant Corten steel. This makes the regional office resilient for the future.Text description provided by the architects.Commissioned by e

Project Information FAQ

Project Information

3 Q
The project “Liander Westpoort / De Zwarte Hond” is an infrastructure initiative in the Steel sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The office building and training facilities have an all-timber construction, designed to be flexible and create a healthy working environment. Thanks to its detachable structural set-up the parking building can grow or shrink. The facades are made of weather-resistant Corten steel. This makes the regional office resilient for the future.Text description provided by the architects.Commissioned by energy network company Alliander, De Zwarte Hond designed the new regional offices 'Liander Westpoort', located in the port area ofAmsterdamand consisting of an office building, workshops, warehouses, test facilities, an educational- and parking building. Together with clients Alliander, IMd, Copper8, and DGMR, De Zwarte Hond formulated sustainability ambitions resulting in high flexibility, scalability, and modularity.Workshops and storage areas have been designed with the same care as the office building and are welded together into a robust and impressive whole. The plan thus evokes memories of the heyday of industrial architecture, but with an underlying sustainability ambition that is entirely focused on the future. At the same time, the building is cost-efficient, by building compactly, limiting the façade surface, and focusing on the reuse of materials.The design consists of a rhythmic alternation of buildings with spaces in between, which are positioned on the plot like a barcode. At the top, the office forms a height accent and is therefore visible from the A5 motorway. Its wooden construction helps to create a healthy working environment. Liander Westpoort also stands out for its equal attention to all parts of the program.The large atrium with its wooden central staircases creates an environment that encourages meetings and interactions. An example of sustainability, the building is gas-free and energy-neutral, contributing to a circular economy. A biodiverse landscape plan is inviting to people and animals. Rich planting around and on the buildings provides a habitat for insects, birds, amphibians, and small mammals.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data