Liangping-Qianjiang Expressway on BOT basis
The status, timeline and source of this project. A free account opens every field.
Source: InfraPPPWorld
The project comprises the development of a 86 km dual-way and four-lane expressway with a designed speed of 80 km/h. The road project will be developed on a build operation and transfer (BOT) basis. The concession period will be 29 years and eight months.
- Status
- Closed
- Sector
- Road
- Location
- China
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Liangping-Qianjiang Expressway on BOT basis
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the development of a 86 km dual-way and four-lane expressway with a designed speed of 80 km/h. The road project will be developed on a build operation and transfer (BOT) basis. The concession period will be 29 years and eight months. |
Original sector | Transport |
Procurement method |
Location
Country | China |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in China
- Yebatan Hydropower Project
- Waigaoqiao Power Station Shanghai
- Yibin to Yiliang Expressway
- Fenhe Reservoir Section of National Highway 241 and Provincial Highway Lanma Line
- Shanxi Province National and Provincial Road Surface Reconstruction Project (Linfen)
- Yuanjiang - Manzhou Expressway
- Jiaozuo - Wen County Expressway
- Keshan County Road Network Improvement