logo
ProjectClosed

Liao River Basin Project

Closed · China

Source: World Bank Group

The Liao River Basin Project will assist in the environmental recovery of, and enhance water quality management for an integrated river basin management approach, in the Liaoning Province. The components include: 1) construction of the wastewater interception, and treatment plant at Panjin, as well as interceptor sewers, and new pumping stations - including modifications to existing pumping statio

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Cement, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Liao River Basin Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Liao River Basin Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Liao River Basin Project will assist in the environmental recovery of, and enhance water quality management for an integrated river basin management approach, in the Liaoning Province. The components include: 1) construction of the wastewater interception, and treatment plant at Panjin, as well as interceptor sewers, and new pumping stations - including modifications to existing pumping stations. A sanitary landfill for sludge disposal will be in place; 2) wastewater treatment, recycling, and process modifications, for the recovery of processed raw materials, to obtain lignin products (lignosulfonate), a binding material used primarily for zinc manufacturing; 3) construction of the wastewater treatment plant at Xipaotai, to serve the southern/western catchments of Yingkou, which includes as well, interceptor sewers, construction, or upgrading of pumping stations, in addition to the installation of sanitary landfills; 4) construction of a chlorine production facility, based on modern ion membrane cell technology. Remedial measures to recover mercury will be taken into account, and disbursements will be subject to the development of an action plan for demolition of the mercury electrolysis facility, and satisfactory completion of mercury's remedial measures; 5) works, and equipment for reinforced concrete pipe interceptors along the north bank of the Xiaoling River, a wastewater treatment plant, and a sanitary landfill for sludge disposal; 6) support for urban management information systems on infrastructure planning, and, expansion of environmental water, and air quality monitoring, through improved monitoring stations; and, 7) sub-loans provision for high-environmental impact investments in in-plant technology process change, and, support institutional strengthening, and training of wastewater companies in financial, operational, and managerial capacities.

Original sector

FY17 - Industry, Trade and Services,FY17 - Public Administration,Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Cement, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project