Liaoning Third Medium Cities Infrastructure
Sector: Road • Location: China
Source: World Bank Group
The objective of the Liaoning Third Medium Cities Infrastructure Project for China is to improve the energy efficiency and environmental performance of heating and gas services in selected areas of participating cities in Liaoning Province. There are three components to the project. The first component is the centralized heating infrastructure, it will contribute to implementation of heating refor
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Steel, Geothermal, Metal, Commercial, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Liaoning Third Medium Cities Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Liaoning Third Medium Cities Infrastructure Project for China is to improve the energy efficiency and environmental performance of heating and gas services in selected areas of participating cities in Liaoning Province. There are three components to the project. The first component is the centralized heating infrastructure, it will contribute to implementation of heating reform by implementing in new Heat-only Boiler (HoB) and Combined Heat and Power (CHP) supplied systems: (i) demand driven ready systems across the heating chain; (ii) establishing a metering regime across the heating chain (at boiler plants and substations); and (iii) piloting technical approaches in network design through use of about 150 building level substations and in metering through use of building level meters. The second component is the urban gas infrastructure. This component comprises: (a) rehabilitation of gas transmission facilities; (b) rehabilitation and capacity expansion of gas storage equipment involving rehabilitation of the existing 20,000 and 50,000 meters capacity storage tanks and provision of a new 50,000 meters storage tank; and (c) rehabilitation and capacity expansion of gas distribution network including the upgrading of facilities for pressure flow control, corrosion control, supervisory control and data acquisition (SCADA), and emergency response arrangements. Finally, the third component is the institutional development. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Steel, Geothermal, Metal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
