Libby Dam Flood Risk Management Operation
Sector: Hydro • Location: Bonners Ferry, Idaho, United States
Source: KBOI
Libby Dam is being operated for flood risk management due to high flows downstream at Bonners Ferry. Outflows were reduced on Dec. 11 from 17,000 cubic feet per second to 4,000 cubic feet per second to keep the Kootenai River at Bonners Ferry below flood stage. The flow peaked at 1,761.7 feet on Dec. 11 evening. Libby Dam has since increased outflows to continue normal winter drawdown.
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage, Government
- Location
- Bonners Ferry, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- KBOI
ConstructChat
Ask ConstructChat about Libby Dam Flood Risk Management Operation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Libby Dam is being operated for flood risk management due to high flows downstream at Bonners Ferry. Outflows were reduced on Dec. 11 from 17,000 cubic feet per second to 4,000 cubic feet per second to keep the Kootenai River at Bonners Ferry below flood stage. The flow peaked at 1,761.7 feet on Dec. 11 evening. Libby Dam has since increased outflows to continue normal winter drawdown. |
Original sector | Water Management |
Location
Country | United States of America (USA) |
State | Idaho |
City | Bonners Ferry |
Source
Source | KBOI |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Government |
Article published date | 2025-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
