Liberal Green Hydrogen Facility - 1 GW
Sector: Wind • Location: Liberal, Kansas, United States of America
Source: Dodge USA
1 gigawatt electrolyzer facility, separating the hydrogen from the City of Liberal's treated wastewater. To use on-site wind and solar energy generation and battery energy storage for the electrolysis and green fuels production facility. The electrolysis procedure electrical current would split the hydrogen from the water from the City's Wastewater Treatment Plant from the oxygen and compress the
- Status
- Prospective
- Sector
- Wind, Raw Materials, Energy Storage, Chemical (Industrial), Power Generation (CCGT), Hydrogen, Solar, Water Supply and Storage, Manufacturing (Industrial), Commercial
- Location
- Liberal, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Liberal Green Hydrogen Facility - 1 GW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1 gigawatt electrolyzer facility, separating the hydrogen from the City of Liberal's treated wastewater. To use on-site wind and solar energy generation and battery energy storage for the electrolysis and green fuels production facility. The electrolysis procedure electrical current would split the hydrogen from the water from the City's Wastewater Treatment Plant from the oxygen and compress the hydrogen to use in agricultural, transportation, and or heavy industrial manufacturing. |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Liberal |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Energy Storage, Chemical (Industrial), Power Generation (CCGT), Hydrogen, Solar, Water Supply and Storage, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
