LIBERIA - Renewable Energy for Electrification in Liberia (REEL Project) - Additional Financing

Sector: Hydro • Location: Liberia

Source: African Development Bank (AfDB)

Project

The Renewable Energy for Electrification in Liberia (REEL) – Additional Financing Project aims to complete the development of a 9.34 MW run-of-river hydropower plant at Gbedin Falls, together with its evacuation line, substations, access roads, and distribution network across Nimba County. The project was originally approved in 2019 and is implemented by the Government of Liberia and the African D

Project Information FAQ

Project Information

4 Q
The project “LIBERIA - Renewable Energy for Electrification in Liberia (REEL Project) - Additional Financing” is an infrastructure initiative in the Hydro sector, located in Liberia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Renewable Energy for Electrification in Liberia (REEL) – Additional Financing Project aims to complete the development of a 9.34 MW run-of-river hydropower plant at Gbedin Falls, together with its evacuation line, substations, access roads, and distribution network across Nimba County. The project was originally approved in 2019 and is implemented by the Government of Liberia and the African Development Bank through the Rural and Renewable Energy Agency (RREA). Additional financing became necessary following significant cost overruns related to higher-than-expected hydropower plant construction bids and unforeseen topographical constraints affecting access road works. The revised total project cost now amounts to UA 32.11 million, compared to the initial UA 24.45 million. The African Development Fund is providing UA 5.47 million in new loan resources, bringing the Bank Group’s total contribution to UA 29.12 million, while the Government of Liberia is contributing UA 2.99 million, including UA 2.19 million earmarked for the access road. No changes have been made to the project’s scope or design; the additional financing strictly covers the funding gap required to complete the original components, including the hydropower plant, road works, safeguards implementation, project management, and the Gender Action Plan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data