logo

Liberia - Renewable Energy for Electrification in Liberia (REEL Project)

Sector: Commercial • Location: Liberia

Source: African Development Bank (AfDB)

Project

The Renewable Energy for Electrification in Liberia (REEL Project) aims at developing the run-of-river Gbedin Falls HPP with a total capacity of 9.34 MW. The power plant will be located in the St. John River in the Nimba County and will connect to the existing cross-borderline between Liberia and Côte d’Ivoire through an 8km 33kV evacuation line. The project is expected to become a source of relia

Project Information FAQ

Project Information

4 Q
The project “Liberia - Renewable Energy for Electrification in Liberia (REEL Project)” is an infrastructure initiative in the Commercial sector, located in Liberia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Renewable Energy for Electrification in Liberia (REEL Project) aims at developing the run-of-river Gbedin Falls HPP with a total capacity of 9.34 MW. The power plant will be located in the St. John River in the Nimba County and will connect to the existing cross-borderline between Liberia and Côte d’Ivoire through an 8km 33kV evacuation line. The project is expected to become a source of reliable, sustainable and affordable power in the region, allow grid expansion to isolated localities and remote areas, and encourage the connection of a larger amount of households, schools, health centers, businesses and industries to the national grid. It will also significantly reduce the number of fossil energy units and increase the electrification rate in Liberia. The project’s total cost is estimated at UA 24.45 million and will be implemented over the 2019-2024 period. The project has three components, namely: (i) Infrastructure, (ii) support for project implementation, and (iii) technical assistance and capacity building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data