logo

Liberia - Water Sector Reform Study

Sector: Water Supply and Storage • Location: Liberia

Source: African Development Bank (AfDB)

Project

The present intervention concerns the Water Sector Reform Study. The project is in line with the need to prioritize and accelerate sector reform and development and to undertake rehabilitation to the Water and Sanitation infrastructure in post-conflict countries of Africa. It is also aligned with strategies to meet MDGs and with the Africa Water Vision Framework for Action. The project together wi

Project Information FAQ

Project Information

4 Q
The project “Liberia - Water Sector Reform Study” is an infrastructure initiative in the Water Supply and Storage sector, located in Liberia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the Water Sector Reform Study. The project is in line with the need to prioritize and accelerate sector reform and development and to undertake rehabilitation to the Water and Sanitation infrastructure in post-conflict countries of Africa. It is also aligned with strategies to meet MDGs and with the Africa Water Vision Framework for Action. The project together with the efforts of the other donors in the sector should assist with the most critical needs for sector reform. Its main outputs are: (i) sector reform plans involving capacity building, implementation of the recent adopted IWRM policy and institutional restructuring, (ii) short (2010) to medium (2012-2015) term investment plans and (iii) organizational and human capacity in the area of IWRM and Capital Investment Planning strengthened through functional training delivered to about 200 staff. It comprises three main components, namely: (1) Sector Reform Study, (2) Functional Training, and (3) Project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data