logo

Liberia Accelerated Electricity Expansion Project (LACEEP)

Sector: Power Generation (CCGT) • Location: Liberia

Source: World Bank

Project
Closed

The objectives of the Accelerated Electricity Expansion Project for Liberia are to increase access to electricity and strengthen institutional capacity in the electricity sector. The project has 3 components. (1) Extension of electricity transmission and distribution systems component will provide access to electricity to about 10,300 new users located not only in Monrovia but also outside of the

Project Information FAQ

Project Information

5 Q
The project “Liberia Accelerated Electricity Expansion Project (LACEEP)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Liberia. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Accelerated Electricity Expansion Project for Liberia are to increase access to electricity and strengthen institutional capacity in the electricity sector. The project has 3 components. (1) Extension of electricity transmission and distribution systems component will provide access to electricity to about 10,300 new users located not only in Monrovia but also outside of the capital, along the corridor to the town of Kakata. In addition, the transmission line along the corridor will have the capacity to connect around other 6,000 new consumers if additional financing becomes available. (2) Construction of facilities for off-loading, transport, and storage of heavy fuel oil (HFO) and support for optimization of HFO procurement component will support the government's decision to replace current expensive diesel-based generation with less costly HFO-based thermal generation. There are both physical and commercial aspects to optimizing the supply of fuel. Firstly, more reliable HFO supply will require physical investments in HFO off-loading, transport and storage facilities. Secondly, it requires improving HFO procurement practices. (3) Support for the expansion of supply options and for the strengthening of the sector's institutional capacity component will support the overall strengthening of Ministry of Lands, Mines and Energy’s institutional capacity to plan and implement electricity access programs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data