logo

Liberty Ave Waterline Replacement Phase 4

Sector: Water Supply and Storage • Location: Vermilion, Ohio, United States of America

Source: Dodge

Project
Closed

the project consists of construction of approximately1,503 feet of new 12 water main along Liberty Avenue from West River Road to west of Vermilion Road as well as the following: boring pits and boring under the Vermilion River with 278 L.F. of 24 steel casing, hydrant replacements, side street reconnections, water service reconnections and in-place abandonment of the existing water main.

Status
Closed
Sector
Water Supply and Storage, Government, Steel, Road, Commercial, Waste Processing and Treatment, Metal
Location
Vermilion, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Liberty Ave Waterline Replacement Phase 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Liberty Ave Waterline Replacement Phase 4” is an infrastructure initiative in the Water Supply and Storage sector, located in Vermilion, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

the project consists of construction of approximately1,503 feet of new 12 water main along Liberty Avenue from West River Road to west of Vermilion Road as well as the following: boring pits and boring under the Vermilion River with 278 L.F. of 24 steel casing, hydrant replacements, side street reconnections, water service reconnections and in-place abandonment of the existing water main.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Vermilion

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Steel, Road, Commercial, Waste Processing and Treatment, Metal

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project