Liberty Hill ISD New Campus Elementary No. 8
Sector: Raw Materials • Location: Liberty Hill, Texas, United States of America
Source: Dodge USA
108,416-square-foot campus for 1,000 students. The campus will feature 16 additional classrooms, an additional science area, art and music rooms, and larger administrative and dining spaces than an elementary school design for 750 students, 54 classrooms * A cafeteria * A gym * Art and music rooms * Science labs * A library with an outside porch area * An outdoor courtyard space * Visitor parking
- Status
- Closed
- Sector
- Raw Materials, Education, Power Transmission, Steel, Car parking, Consumer Products, Government, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial
- Location
- Liberty Hill, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Liberty Hill ISD New Campus Elementary No. 8
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 108,416-square-foot campus for 1,000 students. The campus will feature 16 additional classrooms, an additional science area, art and music rooms, and larger administrative and dining spaces than an elementary school design for 750 students, 54 classrooms * A cafeteria * A gym * Art and music rooms * Science labs * A library with an outside porch area * An outdoor courtyard space * Visitor parking and a parent drop-off area * A bus drop-off area. The two-story design features prekindergarten t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Liberty Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Education, Power Transmission, Steel, Car parking, Consumer Products, Government, Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
