In March 2009, the greenfield, 200 MW Liberty Power Tech Project, which was being developed by Liberty Power Tech Limited in combined cycle configuration in Faisalabad, reached financial closure. The project was developed on a build, own and operate (BOO) basis. Liberty Power Tech Limited, the project company, was owned by the Mukaty Family and Liberty Mills Limited [Pakistan].
The Liberty Power
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Punjab, Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Liberty Power Tech Faisalabad Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In March 2009, the greenfield, 200 MW Liberty Power Tech Project, which was being developed by Liberty Power Tech Limited in combined cycle configuration in Faisalabad, reached financial closure. The project was developed on a build, own and operate (BOO) basis. Liberty Power Tech Limited, the project company, was owned by the Mukaty Family and Liberty Mills Limited [Pakistan]. The Liberty Power Tech Project was procured by the Private Power and Infrastructure Board (PPIB), although information on the method of contract award was not publicly available. On April 10, 2008, Pakistan's National Electric Power Regulatory Authority (NEPRA) approved a generation tariff, valid until December 2035, for the project. On June 16, 2008, an implementation agreement (IA) was signed. Liberty Power Tech also signed a 25 year power purchase agreement (PPA) with the National Transmission and Despatch Company (NTDC), signed July 2008. The plant consisted of 11 DG (Wartsila W18V46) + 11 WHEGB* +1 ST. The fuel was supplied by Shell Pakistan, signed December 2008. The project was commissioned in January 2011. According to PPIB, the project reached financial close in March 2009. The total project cost was US$240 million. Project debt was provided by Allied Bank Limited (ABL), Habib Bank Limited (HBL), National Bank Limited (NBP), Faysal Bank Limited (FBL), Meezan Bank Ltd and Bank Al-Falah. The amount and structure of the debt facility were not made publicly available at the time of financial closure. The plant was due to be commissioned in December 2010. http://www.ppib.gov.pk/N_lpt.htm |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
State | Punjab |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Pakistan
- Balloki CombinedCycle Power Project
- Ghazi Barotha RunofRiver Hydroelectric Project
- Karachi nuclear power plant KANUPP expansion
- Engro Thar Block II Power Plant Pakistan
- Bin Qasim Power Station 3 BQPSIII
- Engro Qadirpur NGCC Power Project
- Metro Wind Thatta District Onshore Wind Farm
- Matiari-Lahore Transmission Line