logo

Libra Solar Project

Sector: Solar • Location: Yerington, Nevada, United States

Source: Power Engineering

Project
Planned

Libra Solar is a 700 MW solar and 700 MW/2.8 GW battery storage project being developed by Arevia Power. It will be located on 5,141 acres in Nevada and is expected to produce 1,948,000 MWh annually, making it one of the largest solar + battery energy storage projects in the U.S.

Project Information FAQ

Project Information

4 Q
The project “Libra Solar Project” is an infrastructure initiative in the Solar sector, located in Yerington, Nevada, United States. Taiyo aggregates data on it from Power Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Libra Solar is a 700 MW solar and 700 MW/2.8 GW battery storage project being developed by Arevia Power. It will be located on 5,141 acres in Nevada and is expected to produce 1,948,000 MWh annually, making it one of the largest solar + battery energy storage projects in the U.S.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data