logo
ProjectPlanned

Libra Solar Project

Planned · Nevada · Last reported Jan 2026

Source: Solar Builder

The Libra Solar project is a 700 MW solar photovoltaic power generating facility combined with a 700 MW battery energy storage system on 5,778 acres of BLM-administered land in Mineral County, Nevada. It includes solar modules mounted on single-axis horizontal tracker structures and integrated battery energy storage. The project was originally approved in September 2024 but was delayed due to regu

Status
Prospective
Sector
Solar, Energy Storage, Power Generation (CCGT)
Location
Yerington, Nevada, United States of America
Updated
22 Jul 2026
Source
Solar Builder

ConstructChat

Ask ConstructChat about Libra Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Libra Solar Project” is an infrastructure initiative in the Solar sector, located in Yerington, Nevada, United States. Taiyo aggregates data on it from Solar Builder.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Libra Solar project is a 700 MW solar photovoltaic power generating facility combined with a 700 MW battery energy storage system on 5,778 acres of BLM-administered land in Mineral County, Nevada. It includes solar modules mounted on single-axis horizontal tracker structures and integrated battery energy storage. The project was originally approved in September 2024 but was delayed due to regulatory changes. The U.S. Bureau of Land Management has now authorized revisions to the project, allowing construction to start in 2026.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Yerington

Source

Source

Solar Builder

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT)

Article published date

2025-12-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project