logo

Libramiento de Irapuato

Sector: Road • Location: Mexico

Source: World Bank Group

Project
Active

On January 30 2008, a Mexican consortium comprised of Grupo Hermes and La Peninsular Compania Constructora SA de CV signed a 30-year contract with the Secreteria de Comunicaciones y Transporte (SCT) to build, operate and maintain the Libramiento de Irapuato in the state of Guanajuato. The bypass was to connect the federal highways Irapuato-Guanajuato and Irapuato-Leon and be 29.2 kilometers long,

Project Information FAQ

Project Information

4 Q
The project “Libramiento de Irapuato” is an infrastructure initiative in the Road sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On January 30 2008, a Mexican consortium comprised of Grupo Hermes and La Peninsular Compania Constructora SA de CV signed a 30-year contract with the Secreteria de Comunicaciones y Transporte (SCT) to build, operate and maintain the Libramiento de Irapuato in the state of Guanajuato. The bypass was to connect the federal highways Irapuato-Guanajuato and Irapuato-Leon and be 29.2 kilometers long, 12 meters wide with two lanes and shoulders of 2.5 meters on each side. The contract was awarded on December 13, 2007 and was tendered under the rules of Mexico’s New Highway Concession Model (Nueva Esquema de Concesiones). The New Highway Concession Model stipulated that the bidding criteria in a given tender was the lowest net present value of subsidies in the form of fixed or variable payments, or in the case of projects not requiring subsidies, the highest payment to the government. A revenue guarantee was given for all projects tendered under the rules of the model. A call for tenders was launched on March 6, 2006. Six consortia submitted final bids: • Consorcio integrado por: Grupo Hermes, SA de CV and La Peninsular Comapnia Constructora, SA de CV • Consorcio integrado por: Promotora del Derrallo de America Latina, SA de CV and Promotora Inbursa, SA de CV • Libramiento y Acceeso de Irapuato, SA de CV • Controladora de Operaciones de Infraestructura, SA de CV and Constructoras ICA, SA de CV • Concesionaria de Bajio, SA de CV The consortium led by Grupo Hermes -La Peninsular won the tender with an offer of 261 million Mexican pesos (US $23.5 million) as a payment to SCT as well as total financial responsibility for the construction costs of the project. The winning consortium formed Infraestructura Concesionada de Irapuato SA de CV as the project company with an ownership of structure of: Grupo Hermes, SA de CV [Mexico, 50%] and Peninsular Compania Constructora, SA de CV [Mexico, 50%]. The project cost was estimated at US $133.84 million. The project reached financial closure in July 2008 through a US $107.02 million bilateral loan by HSBC. The project had a debt to equity ratio of 80:20 (US $107.02 million debt and US $26.82 million equity). The project became operational in March 2011 after being inaugurated by President Felipe Calderon

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data