Libya Intisar A/103 to Brega Gas Pipeline
Sector: Oil and Gas • Location: Libya
Source: Business Insider Africa
Libya has restarted testing on a long-delayed gas pipeline connecting the Intisar A/103 field to the Brega gas network, stretching about 130 kilometres. The pipeline aims to recover up to 150 million cubic feet of gas per day that was previously flared, reduce production bottlenecks, and support plans to expand gas exports to Europe.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Libya
- Updated
- 22 Jul 2026
- Source
- Business Insider Africa
ConstructChat
Ask ConstructChat about Libya Intisar A/103 to Brega Gas Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under testing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Libya has restarted testing on a long-delayed gas pipeline connecting the Intisar A/103 field to the Brega gas network, stretching about 130 kilometres. The pipeline aims to recover up to 150 million cubic feet of gas per day that was previously flared, reduce production bottlenecks, and support plans to expand gas exports to Europe. |
Original sector | Energy |
Location
Country | Libya |
Source
Source | Business Insider Africa |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
