logo

Libya Intisar A/103 to Brega Gas Pipeline

Sector: Oil and Gas • Location: Libya

Source: Business Insider Africa

Project
Under Testing

Libya has restarted testing on a long-delayed gas pipeline connecting the Intisar A/103 field to the Brega gas network, stretching about 130 kilometres. The pipeline aims to recover up to 150 million cubic feet of gas per day that was previously flared, reduce production bottlenecks, and support plans to expand gas exports to Europe.

Status
Under Construction
Sector
Oil and Gas
Location
Libya
Updated
22 Jul 2026
Source
Business Insider Africa

ConstructChat

Ask ConstructChat about Libya Intisar A/103 to Brega Gas Pipeline

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Libya Intisar A/103 to Brega Gas Pipeline” is an infrastructure initiative in the Oil and Gas sector, located in Libya. Taiyo aggregates data on it from Business Insider Africa.

Participants

Not available for this record.

Status

Original status

under testing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Libya has restarted testing on a long-delayed gas pipeline connecting the Intisar A/103 field to the Brega gas network, stretching about 130 kilometres. The pipeline aims to recover up to 150 million cubic feet of gas per day that was previously flared, reduce production bottlenecks, and support plans to expand gas exports to Europe.

Original sector

Energy

Location

Country

Libya

Source

Source

Business Insider Africa

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-04-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project