Libya Structures A & E Gas Project
One of 358 projects Taiyo tracks in Libya.
Source: AInvest
An $8 billion gas megaproject centered on the Structures A & E offshore fields in Libya, aiming to boost Mediterranean energy security by 2026. The project includes 750 MMcf/d gas production and a carbon capture and storage facility to meet EU decarbonization standards. It is led by Mellitah Oil & Gas, a joint venture between Libya's National Oil Corporation and Eni, with significant investments f
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Libya
- Updated
- 22 Jul 2026
- Source
- AInvest
ConstructChat
Ask ConstructChat about Libya Structures A & E Gas Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An $8 billion gas megaproject centered on the Structures A & E offshore fields in Libya, aiming to boost Mediterranean energy security by 2026. The project includes 750 MMcf/d gas production and a carbon capture and storage facility to meet EU decarbonization standards. It is led by Mellitah Oil & Gas, a joint venture between Libya's National Oil Corporation and Eni, with significant investments from the U.S. and Italy through the Mattei Plan. |
Original sector | Energy |
Budget |
Location
Country | Libya |
Source
Source | AInvest |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
