logo
ProjectClosed

Licking Potable Water System Improvements - Part1 & Part 2

One of 10,000+ projects Taiyo tracks in Missouri.

Source: Dodge USA

The contract consists of installing approximately 20,400 LF of 6 water mains with PVC SDR-21 or High Density Polyethylene, DR-11 piping, with 47 gate valves, 35 fire hydrants, 42 water line connections and 196 service lateral connections, 13,370 LF of Asphalt Street (2 ft. wide) Pavement, and all related components to complete Part 2 of the project detailed within.

Status
Closed
Sector
Water Supply and Storage, Commercial, Road, Government, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial)
Location
Licking, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Licking Potable Water System Improvements - Part1 & Part 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Licking Potable Water System Improvements - Part1 & Part 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Licking, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The contract consists of installing approximately 20,400 LF of 6 water mains with PVC SDR-21 or High Density Polyethylene, DR-11 piping, with 47 gate valves, 35 fire hydrants, 42 water line connections and 196 service lateral connections, 13,370 LF of Asphalt Street (2 ft. wide) Pavement, and all related components to complete Part 2 of the project detailed within.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Licking

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Road, Government, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial)

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project