logo

Life Cycle Center for Power CABLE diaGNOSIS

Sector: Power Generation (CCGT) • Location: Greece, France, Netherlands, Cyprus, United Kingdom, Italy, Bulgaria, Hungary

Source: EU Funding & Tenders Portal

Project
Ongoing

The EU goals for the clean energy transition require at least a 55% reduction in greenhouse gas emissions (from 1990 levels) by 2030, according to the ‘Fit for 55’ package. To achieve these goals, electricity grids will be required to operate in an overall context of 50% electricity production from RES of any scale by 2030. The huge rise in the share of solar PV and wind in total generation fundam

Project Information FAQ

Project Information

4 Q
The project “Life Cycle Center for Power CABLE diaGNOSIS” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Greece, France, Netherlands, Cyprus, United Kingdom, Italy, Bulgaria, Hungary. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EU goals for the clean energy transition require at least a 55% reduction in greenhouse gas emissions (from 1990 levels) by 2030, according to the ‘Fit for 55’ package. To achieve these goals, electricity grids will be required to operate in an overall context of 50% electricity production from RES of any scale by 2030. The huge rise in the share of solar PV and wind in total generation fundamentally reshapes the European power system and significantly increases the need to build new HVAC or HVDC cable connections. These will have a crucial role to link islands or offshore wind parks to mainland or to connect countries over long distances. The CABLEGNOSIS project aims to deliver innovative cable technologies that will support the clean energy transition era for the 2050 targets set at European level. CABLEGNOSIS project will develop innovative insulation and conductor design technologies, high performance and environmentally friendly cable insulation materials, ageing studies of superconducting cables, recyclability technologies for the materials used in power cables, as well as pre-fault condition, aging and remote monitoring AI-based tools. A feasibility assessment framework and detailed analysis for the use of superconducting cables for submarine connections. A respective feasibility analysis will be developed for the offshore wind parks in The Netherlands and Germany. The CABLEGNOSIS technologies will be validated in five European countries (Italy, UK, Greece, Hungary, Cyprus). CABLEGNOSIS will deliver a complete deployment plan for supporting the development and operation of efficient, reliable and environmentally friendly cable systems to support the energy transition. The deployment plan will provide the scalability and replicability framework of using the CABLEGNOSIS technologies in future cable development projects, with emphasis in the UK-Morocco interconnection, Cyprus-Israel interconnection, offshore developments in the Aegean Sea.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data