Lift Station 15 Rehabilitation
Sector: Waste Processing and Treatment • Location: Port Saint Lucie, Florida, United States of America
Source: Dodge USA
The Project consists of three (3) options for rehabilitation/and or replacing existing Lift Station SP-15 including replacing approximately 600 lineal feet of 4-inch to 6 PVC force main pipes and approximately 2500 lineal feet of 2 pvc fiber and fiber boxes. This work also includes all associated piping and piping connections, pumps, electrical service, lift station controls, control panel with fi
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Water Supply and Storage, Seaport
- Location
- Port Saint Lucie, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift Station 15 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of three (3) options for rehabilitation/and or replacing existing Lift Station SP-15 including replacing approximately 600 lineal feet of 4-inch to 6 PVC force main pipes and approximately 2500 lineal feet of 2 pvc fiber and fiber boxes. This work also includes all associated piping and piping connections, pumps, electrical service, lift station controls, control panel with fiber communication, and accessories, valves and all other items identified on the Contract Drawing... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port Saint Lucie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial, Water Supply and Storage, Seaport |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
