Lift Station 19 Improvements
Sector: Water Supply and Storage • Location: Harlingen, Texas, United States of America
Source: Dodge
Lift Station LS-19 upstream of the LCI has insufficient depth relative to its influent sewers resulting in extensive surcharge within its sewer shed even in dry conditions. The lift station does not have sufficient capacity and is perpetually surcharged. The existing sewer pipe into LS-19 has a substandard slope and is easily overloaded. The elimination of the lift station and the relaying of the
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial
- Location
- Harlingen, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lift Station 19 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lift Station LS-19 upstream of the LCI has insufficient depth relative to its influent sewers resulting in extensive surcharge within its sewer shed even in dry conditions. The lift station does not have sufficient capacity and is perpetually surcharged. The existing sewer pipe into LS-19 has a substandard slope and is easily overloaded. The elimination of the lift station and the relaying of the trunk line down 9th street ensures sufficient depth and slope for proper conveyance. Harlingen Wa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Harlingen |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
