Lift Station 4 Replacement REBID
Sector: Power Generation (CCGT) • Location: Holly Hill, Florida, United States of America
Source: Dodge USA
Description of Work: Replacement of the City s Lift Station #4. Work includes demolition of existing lift station, installation of a new wet well with three (3) submersible pumps and one (1) mixer, permanent bypass pump, new electrical system and associated improvements. Pump, mixer, and permanent bypass pump equipment will be provided by the City.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Holly Hill, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift Station 4 Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description of Work: Replacement of the City s Lift Station #4. Work includes demolition of existing lift station, installation of a new wet well with three (3) submersible pumps and one (1) mixer, permanent bypass pump, new electrical system and associated improvements. Pump, mixer, and permanent bypass pump equipment will be provided by the City. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Holly Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
