Lift Station #5 Rehabilitation REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This upgrade includes converting the existing 6-feet diameter wet well into the new receiving manhole, partially demolish the existing dry well, the installation of a new valve vault with 6-inch discharge piping and a new 8-feet ID wet well, as well as the installation of a new control panel and electrical equipment. This upgrade will improve the reliability, operability, efficiency, and safety of
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government
- Location
- Lauderhill, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift Station #5 Rehabilitation REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This upgrade includes converting the existing 6-feet diameter wet well into the new receiving manhole, partially demolish the existing dry well, the installation of a new valve vault with 6-inch discharge piping and a new 8-feet ID wet well, as well as the installation of a new control panel and electrical equipment. This upgrade will improve the reliability, operability, efficiency, and safety of Lift Station No. 5 and will extend the useful life of the station. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Lauderhill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
