Lift Station 6 Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Full replacement of Lift Station #6, located at the Old Dairy Road intersection. The single-chamber lift station has a fiberglass wet well with observable penetrations along its perimeter allowing for exfiltration, and piping proceeding from the lift station to the transmission force main is thin-walled plastic piping running beneath the highway that froze during the winter of 2021. Work will incl
- Status
- Prospective
- Sector
- Consumer Products, Cement, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Alaska, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift Station 6 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Full replacement of Lift Station #6, located at the Old Dairy Road intersection. The single-chamber lift station has a fiberglass wet well with observable penetrations along its perimeter allowing for exfiltration, and piping proceeding from the lift station to the transmission force main is thin-walled plastic piping running beneath the highway that froze during the winter of 2021. Work will include installing a new concrete vault wet well with traffic rated lid, valve vault, and new pressur... |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Cement, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
