Lift Station No 12 Improvements
Sector: Water Supply and Storage • Location: Lawrenceburg Township, Indiana, United States of America
Source: Dodge
DESCRIPTION OF WORK: This project is for the rehabilitation of Lift Station No. 12 and will include bypass pumping, demolition of existing piping, pumps, and controls, installation of new piping, new pumps, and new controls. The existing concrete wet well, valve vault, and meter vault will remain and be reused.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Commercial
- Location
- Lawrenceburg Township, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lift Station No 12 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK: This project is for the rehabilitation of Lift Station No. 12 and will include bypass pumping, demolition of existing piping, pumps, and controls, installation of new piping, new pumps, and new controls. The existing concrete wet well, valve vault, and meter vault will remain and be reused. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Lawrenceburg Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
