Lift Station No. 2 Rehabilitation
Sector: Steel • Location: Hopkins, Minnesota, United States of America
Source: Dodge USA
- Removal of existing lift station pumps, valve, piping fittings, control panel, top of steel wet well, and all related appurtenances at Hopkins Lift Station No. 2. 2. Installation of new prefabricated fiberglass wet well into the existing steel wet well. Installation of new pumps, piping, valves, and all appurtenances for the new lift station. 3. Installation of city procured controls and SCADA
- Status
- Closed
- Sector
- Steel, Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage
- Location
- Hopkins, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift Station No. 2 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Removal of existing lift station pumps, valve, piping fittings, control panel, top of steel wet well, and all related appurtenances at Hopkins Lift Station No. 2. 2. Installation of new prefabricated fiberglass wet well into the existing steel wet well. Installation of new pumps, piping, valves, and all appurtenances for the new lift station. 3. Installation of city procured controls and SCADA infrastructure. 4. Perform various other miscellaneous and site improvements as detailed in the C... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Hopkins |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Waste Processing and Treatment, Government, Metal, Commercial, Water Supply and Storage |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
