Lift Station Rehabilitation REBID
Sector: Power Generation (CCGT) • Location: Los Alamos, New Mexico, United States of America
Source: Dodge USA
Lift Station Rehabilitation The summary of work is as follows, but is not limited to the following: This project will rehabilitate two dry/wet well sewage lift stations, one off of North Road and the other within the Los Arboles housing community. As per the plans, all the mechanical and electrical components, including pumps, lighting, ventilation, receptacles, wiring, and piping, will be removed
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Los Alamos, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift Station Rehabilitation REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lift Station Rehabilitation The summary of work is as follows, but is not limited to the following: This project will rehabilitate two dry/wet well sewage lift stations, one off of North Road and the other within the Los Arboles housing community. As per the plans, all the mechanical and electrical components, including pumps, lighting, ventilation, receptacles, wiring, and piping, will be removed and replaced for both lift stations. Remove the existing control panel and systems and replace t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Los Alamos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
