Lift Stations – Collection System Improvements
Sector: Power Generation (CCGT) • Location: CA, United States of America (USA)
Source: Anvil Builders
This project for the City of San Mateo as part of the Clean Water Program. The Clean Water Program brings the City’s aging wastewater collection and treatment system into the modern age. This vital infrastructure is nearing the end of its useful life, even though nearly 150,000 people in San Mateo, Crystal Springs County Sanitation District, a portion of unincorporated San Mateo County, and the so
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project for the City of San Mateo as part of the Clean Water Program. The Clean Water Program brings the City’s aging wastewater collection and treatment system into the modern age. This vital infrastructure is nearing the end of its useful life, even though nearly 150,000 people in San Mateo, Crystal Springs County Sanitation District, a portion of unincorporated San Mateo County, and the southern portion of the town of Hillsborough rely on it. The lift stations project occurred at two separate locations to completely remove, bypass, and replace the existing lift station facility. The first location is at 38th Avenue and El Camino Real and the second location is at 41st Avenue and Pacific Boulevard. Both locations required temporary bypass pumping and controls to completely remove and replace the existing wet and dry well for each lift station. New 96 inch diameter wet wells were drilled and shored approximately 35 feet in depth. New pumps, piping and pumping equipment with electrical controls and back up diesel powered generator were installed at each lift station. New 8’’ and 12’’ force mains were installed and tied into the existing system in addition to removal and replacement of 8’’ sanitary sewer lines and manholes up to 20 feet in depth. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
