logo

Lift Stations – Collection System Improvements

Sector: Power Generation (CCGT) • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

This project for the City of San Mateo as part of the Clean Water Program. The Clean Water Program brings the City’s aging wastewater collection and treatment system into the modern age. This vital infrastructure is nearing the end of its useful life, even though nearly 150,000 people in San Mateo, Crystal Springs County Sanitation District, a portion of unincorporated San Mateo County, and the so

Project Information FAQ

Project Information

3 Q
The project “Lift Stations – Collection System Improvements” is an infrastructure initiative in the Power Generation (CCGT) sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project for the City of San Mateo as part of the Clean Water Program. The Clean Water Program brings the City’s aging wastewater collection and treatment system into the modern age. This vital infrastructure is nearing the end of its useful life, even though nearly 150,000 people in San Mateo, Crystal Springs County Sanitation District, a portion of unincorporated San Mateo County, and the southern portion of the town of Hillsborough rely on it. The lift stations project occurred at two separate locations to completely remove, bypass, and replace the existing lift station facility. The first location is at 38th Avenue and El Camino Real and the second location is at 41st Avenue and Pacific Boulevard. Both locations required temporary bypass pumping and controls to completely remove and replace the existing wet and dry well for each lift station. New 96 inch diameter wet wells were drilled and shored approximately 35 feet in depth. New pumps, piping and pumping equipment with electrical controls and back up diesel powered generator were installed at each lift station. New 8’’ and 12’’ force mains were installed and tied into the existing system in addition to removal and replacement of 8’’ sanitary sewer lines and manholes up to 20 feet in depth.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data