Lift stations Improvement
Sector: Water Supply and Storage • Location: Southlake, Texas, United States of America
Source: Dodge USA
The purpose of this project is for improvements at the Shady Lane and Lonesome Dove Lift Stations. More specifically the work includes, but is not limited to, construction of the following at each lift station: 1. Addition of vacuum-assist self-priming pumps 2. Furnishing and installing necessary check valves. 3. Furnishing and installing necessary gate valves. 4. Site improvements to support item
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Road, Manufacturing (Industrial)
- Location
- Southlake, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lift stations Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is for improvements at the Shady Lane and Lonesome Dove Lift Stations. More specifically the work includes, but is not limited to, construction of the following at each lift station: 1. Addition of vacuum-assist self-priming pumps 2. Furnishing and installing necessary check valves. 3. Furnishing and installing necessary gate valves. 4. Site improvements to support items above including pump pad. 5. Site electrical improvements to support items above including prog... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Southlake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Road, Manufacturing (Industrial) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
