Light Rail Rail Replacement
Sector: Rail • Location: Seattle, Washington, United States
Source: The Seattle Times
Sound Transit is replacing a 600-foot-long segment of worn-out southbound rails between Pioneer Square Station and International District/Chinatown Station, causing light rail trains to run at reduced frequency for 10 days.
- Status
- Under Construction
- Sector
- Rail, Government
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- The Seattle Times
ConstructChat
Ask ConstructChat about Light Rail Rail Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sound Transit is replacing a 600-foot-long segment of worn-out southbound rails between Pioneer Square Station and International District/Chinatown Station, causing light rail trains to run at reduced frequency for 10 days. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | The Seattle Times |
URL |
More Details
Record type | Project |
Sector | Rail, Government |
Article published date | 2025-04-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
