logo
ProjectPlanned

Lighthouse Data Center Campus

The owner, status and timeline of this project. A free account opens every field.

Source: Circle of Blue

A $15 billion data center campus named Lighthouse is being developed on a 672-acre site near Lake Michigan in Port Washington, Wisconsin. Built by Denver-based Vantage Data Centers, it will encompass four data center buildings to support Oracle and OpenAI operations. The campus will use a closed-loop cooling system to reduce freshwater usage and will require 1.3 gigawatts of power, with 70% from z

Status
Prospective
Sector
Energy Storage, Solar, Data Center, Water Supply and Storage, Power Generation (CCGT), Wind
Location
Port Washington, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Circle of Blue

ConstructChat

Ask ConstructChat about Lighthouse Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lighthouse Data Center Campus” is an infrastructure initiative in the Energy Storage sector, located in Port Washington, Wisconsin, United States. Taiyo aggregates data on it from Circle of Blue.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $15 billion data center campus named Lighthouse is being developed on a 672-acre site near Lake Michigan in Port Washington, Wisconsin. Built by Denver-based Vantage Data Centers, it will encompass four data center buildings to support Oracle and OpenAI operations. The campus will use a closed-loop cooling system to reduce freshwater usage and will require 1.3 gigawatts of power, with 70% from zero emission clean energy resources and plans for solar, wind, and battery power facilities.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Port Washington

Source

Source

Circle of Blue

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Data Center, Water Supply and Storage, Power Generation (CCGT), Wind

Article published date

2025-11-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project