Lighthouse Data Center Campus
Under construction · Wisconsin · Last reported Dec 2025
Source: Market Screener
The Lighthouse data center campus is a digital infrastructure project in Port Washington, Wisconsin, USA, led by Vantage Data Centers. It is designed with sustainability features including closed-loop liquid cooling, zero-emission energy generation, and water-positive operations to power the campus and the region. The Weitz Company, a subsidiary of Orascom Construction, is one of the general contr
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Data Center
- Location
- Port Washington, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Market Screener
ConstructChat
Ask ConstructChat about Lighthouse Data Center Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lighthouse data center campus is a digital infrastructure project in Port Washington, Wisconsin, USA, led by Vantage Data Centers. It is designed with sustainability features including closed-loop liquid cooling, zero-emission energy generation, and water-positive operations to power the campus and the region. The Weitz Company, a subsidiary of Orascom Construction, is one of the general contractors involved in the project. |
Original sector | Construction & Engineering |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Port Washington |
Source
Source | Market Screener |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Data Center |
Article published date | 2025-12-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
