Lighthouse Lane Bridge Replacement
Sector: Bridge • Location: Town of Barton, Wisconsin, United States
Source: Washington County Insider
The project involves replacing the existing Lighthouse Lane Bridge over the Milwaukee River in Washington County, Wisconsin. It includes minor roadway work to ensure a seamless transition into the current roadway conditions. The design process is expected to take approximately two years, with construction scheduled for 2027, administered by the Wisconsin Department of Transportation.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves replacing the existing Lighthouse Lane Bridge over the Milwaukee River in Washington County, Wisconsin. It includes minor roadway work to ensure a seamless transition into the current roadway conditions. The design process is expected to take approximately two years, with construction scheduled for 2027, administered by the Wisconsin Department of Transportation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
