Lightridge & Potomac Falls HS Modular Classroom Bldg Upfit
Sector: Manufacturing (Industrial) • Location: Aldie, Virginia, United States of America
Source: Dodge USA
- This project comprises the upfit of modular classroom buildings at two Loudoun County high schools. The Work shall include coordination with modular building manufacturer/installer; refer to Modular Building specification for additional information. The Work shall also include interior partitions, doors, finishes and equipment, and all civil and utility work, as required by the contract documen
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Commercial, Power Transmission, Education, Government, Power Generation (CCGT)
- Location
- Aldie, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lightridge & Potomac Falls HS Modular Classroom Bldg Upfit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. This project comprises the upfit of modular classroom buildings at two Loudoun County high schools. The Work shall include coordination with modular building manufacturer/installer; refer to Modular Building specification for additional information. The Work shall also include interior partitions, doors, finishes and equipment, and all civil and utility work, as required by the contract documents, at the following two schools: a. Lightridge HS (41025 Collaboration Dr; Aldie, VA; 20105) b. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Aldie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Power Transmission, Education, Government, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
