logo
ProjectPlanning Schematics

Lightshift Battery Energy Storage Facility (Hanover)

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

To be completed in two phases - Phase 1: 35 MW - Phase 2: 30 MW - Substation to utilize 7 acres of a 57.743 acre site

Status
Prospective
Sector
Consumer Products, Steel, Energy Storage, Power Generation (CCGT), Raw Materials, Power Transmission, Commercial
Location
Ashland, Virginia, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lightshift Battery Energy Storage Facility (Hanover)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lightshift Battery Energy Storage Facility (Hanover)” is an infrastructure initiative in the Consumer Products sector, located in Ashland, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

To be completed in two phases - Phase 1: 35 MW - Phase 2: 30 MW - Substation to utilize 7 acres of a 57.743 acre site

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Ashland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Consumer Products, Steel, Energy Storage, Power Generation (CCGT), Raw Materials, Power Transmission, Commercial

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project