Lihue Airport Ust Removals and Replacementswith Asts
Sector: Water Supply and Storage • Location: Lihue, Hawaii, United States of America
Source: Dodge USA
The scope of work consists of the removal of two existing underground storage tanks (UST), serving the terminal and airfield emergency generators, and their appurtenances, replacement with two new above ground storage tanks (AST), and replacement of the existing automatic tank gauges (ATG) at the Lihue Airport, Lihue, Hawaii.
- Status
- Closed
- Sector
- Water Supply and Storage, Airport, Aerospace & Defense, Government, Commercial
- Location
- Lihue, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lihue Airport Ust Removals and Replacementswith Asts
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work consists of the removal of two existing underground storage tanks (UST), serving the terminal and airfield emergency generators, and their appurtenances, replacement with two new above ground storage tanks (AST), and replacement of the existing automatic tank gauges (ATG) at the Lihue Airport, Lihue, Hawaii. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Lihue |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Airport, Aerospace & Defense, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
