Lilac Crescent Infrastructure Upgrades
Sector: Water Supply and Storage • Location: Fredericton, New Brunswick, Canada
Source: Dodge USA
The proposed work includes the replacement of approximately 295 metres of 200 mm PVC sanitary sewer main, 300 metres of DI water main and 310 metres of various sizes of storm sewer main. The work also involves the reinstatement of the roadway granulars, curb & gutter and landscaping, and the placement of asphalt concrete on Lilac Crescent.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Commercial
- Location
- Fredericton, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lilac Crescent Infrastructure Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work includes the replacement of approximately 295 metres of 200 mm PVC sanitary sewer main, 300 metres of DI water main and 310 metres of various sizes of storm sewer main. The work also involves the reinstatement of the roadway granulars, curb & gutter and landscaping, and the placement of asphalt concrete on Lilac Crescent. |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Fredericton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
