Lilac Sewer Realignment Sewer Improvements
Bidding · Kansas · Last reported Dec 2024
Source: Dodge USA
Realignment of the sanitary sewer collection system in- cluding a base bid of con- structing 3 new manholes, approximately 266 feet of bored 10 DR 17 DIPS HDPE, 112 of open trench 10 SDR 26 PVC, 122 feet of 18 SDR 26 PVC, removal of a manhole, repair of asphalt and grass surfacing, traffic control, and appurtenances.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Road, Commercial
- Location
- Holton, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lilac Sewer Realignment Sewer Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Realignment of the sanitary sewer collection system in- cluding a base bid of con- structing 3 new manholes, approximately 266 feet of bored 10 DR 17 DIPS HDPE, 112 of open trench 10 SDR 26 PVC, 122 feet of 18 SDR 26 PVC, removal of a manhole, repair of asphalt and grass surfacing, traffic control, and appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Holton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
