logo

Lily Creek Pedestrian Bridge Rehabilitation

Sector: Bridge • Location: Edmonton, Alberta, Canada

Source: Dodge USA

Project
Bid Results

1,960 M3 Backfill - Crushed Aggregate - Des. 2 Class 25 2,670 M3 Backfill - Non-Granular 289 M3 Heavy Rock Riprap 240 M2 Dense Live Toe Staking Bridge Rehabilitation and Channel Realignment - BF 75425, Lily Creek Pedestrian Bridge near Slave Lake NW 7-74-6-W5M

Status
Closed
Sector
Bridge, Car parking, Road, Automotive, Commercial
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lily Creek Pedestrian Bridge Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lily Creek Pedestrian Bridge Rehabilitation” is an infrastructure initiative in the Bridge sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1,960 M3 Backfill - Crushed Aggregate - Des. 2 Class 25 2,670 M3 Backfill - Non-Granular 289 M3 Heavy Rock Riprap 240 M2 Dense Live Toe Staking Bridge Rehabilitation and Channel Realignment - BF 75425, Lily Creek Pedestrian Bridge near Slave Lake NW 7-74-6-W5M

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Automotive, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project