Lima House / BLOCO Arquitetos
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
Text description provided by the architects.The house is located on a plot in Lago Sul, a residential neighborhood in Brasília. Although the project was designed in 2016, its construction was completed in two phases, the first in 2018 and the second in 2024.One of the premises of the project was to distribute the entire internal area of the house on a single level.This way, the slight slope of the
- Status
- Closed
- Sector
- Residential, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Lima House / BLOCO Arquitetos
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.The house is located on a plot in Lago Sul, a residential neighborhood in Brasília. Although the project was designed in 2016, its construction was completed in two phases, the first in 2018 and the second in 2024.One of the premises of the project was to distribute the entire internal area of the house on a single level.This way, the slight slope of the topography is only noticeable in the elevation of the open area around the pool in relation to the natural ground level. |
Location
Country | Brazil |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
