Lima Metro Line 2 Tunnel Excavation
Sector: Mass Transit • Location: Lima, Peru
Source: Railway PRO
Excavation of 27 km of tunnels for Line 2 of the Lima Metro, Peru's first fully underground metro line, connecting the districts of Ate and Callao. The project includes 35 km of underground lines, 35 stations, 36 ventilation and evacuation shafts, and two rail depots. The excavation phase is completed and the project is moving to track laying and system installations.
- Status
- Under Construction
- Sector
- Mass Transit, Rail, Tunnel
- Location
- Lima, Peru
- Updated
- 22 Jul 2026
- Source
- Railway PRO
ConstructChat
Ask ConstructChat about Lima Metro Line 2 Tunnel Excavation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Excavation of 27 km of tunnels for Line 2 of the Lima Metro, Peru's first fully underground metro line, connecting the districts of Ate and Callao. The project includes 35 km of underground lines, 35 stations, 36 ventilation and evacuation shafts, and two rail depots. The excavation phase is completed and the project is moving to track laying and system installations. |
Original sector | Public Transport |
Location
Country | Peru |
City | Lima |
Source
Source | Railway PRO |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Tunnel |
Article published date | 2026-07-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
