LIMA-RED ROCK INT
Sector: Bridge • Location: Montana, United States of America
Source: Montana Department of Transportation (MDT)
The project on I-15 begins north of the Lima Interchange (Exit 15) at Mile Post 17.1 and proceeds north 20.7 miles ending north of the Red Rock Interchange (Exit 37) at Mile Post 37.8. The intent of this project is to resurface the roadway. This project will include milling the existing asphalt, applying new asphalt, seal and cover, bridge work, guardrail upgrades, cattleguards, rumble strips, pav
- Status
- Prospective
- Sector
- Bridge, Road, Government
- Location
- Montana, United States of America
- Updated
- 19 Nov 2026
- Source
- Montana Department of Transportation (MDT)
ConstructChat
Ask ConstructChat about LIMA-RED ROCK INT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project on I-15 begins north of the Lima Interchange (Exit 15) at Mile Post 17.1 and proceeds north 20.7 miles ending north of the Red Rock Interchange (Exit 37) at Mile Post 37.8. The intent of this project is to resurface the roadway. This project will include milling the existing asphalt, applying new asphalt, seal and cover, bridge work, guardrail upgrades, cattleguards, rumble strips, pavement markings, signing and delineation. |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Department of Transportation (MDT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2024-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
