Lima Wastewater Treatment Plant (SEDAPAL)
Sector: Commercial • Location: Peru
Source: KFW Bank aus Verantwortung
The aim of the Lima Wastewater Disposal Project (SEDAPAL) is to sustainably increase the proportion of ecologically and hygienically safe purification of the collected wastewater as well as the amount of purified wastewater used for irrigation in the metropolis of Lima (FC module objective). The investment project includes the construction of a centrally located sewage treatment plant in the suppl
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The aim of the Lima Wastewater Disposal Project (SEDAPAL) is to sustainably increase the proportion of ecologically and hygienically safe purification of the collected wastewater as well as the amount of purified wastewater used for irrigation in the metropolis of Lima (FC module objective). The investment project includes the construction of a centrally located sewage treatment plant in the supply area of SEDAPAL, the water supplier of the Peruvian capital Lima, whose purified wastewater is to be used to irrigate parks and green spaces. The recycling of wastewater is intended to counteract potential user conflicts over the scarce water resources in the desert region. By contributing to the sustainable improvement of urban hygiene, the protection of water resources and adaptation to the consequences of climate change, the project makes a contribution to the development cooperation program objective and the implementation of the National Plan for Urban Water Management. The project should be carried out in co-finance with the Inter-American Development Bank (IDB), which is financing the expansion of the water and sewage networks in the project region. However, this project component has long been completed. The total cost of building the sewage treatment plant has now risen to around USD 210 million, of which USD 48.66 million will be financed from the FC loan. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
